GH Aquatic & Gym

Senior School

BLDG-GH-AQUATIC • Last updated June 2025

10-Year CapEx

$4.6M

R&M:$1.4M (31%)
Capital:$3.2M (69%)
Timeline
Near-term (Yr 1–2):$3.3M
Medium-term (Yr 3–5):$695k
Long-term (Yr 6–10):$568k
Risk Profile
Highest risk:
High

1 High/Very High items

Next major expenditure: CY2026

ItemDescriptionConditionTypeRiskNear-Term10-Yr TotalActions
3.1

External pathways, concrete hardstandings, painted blockwork walls and pool surrounds. Significant resurfacing required.

Fair
CAP
High
$489k$489kView
4.1

Roof plant — air cooled chiller R1, PowerPax system with twin compressors

Fair
CAP
Moderate
$332k$332kView
4.2

Roof plant — air cooled chiller R2, PowerPax system with twin compressors

Fair
CAP
Moderate
$489k$489kView
4.9

Aquatic centre — 2x air cooled heat pump systems for pool heating

Fair - Good
CAP
Moderate
$342k$342kView
7.1

Pool hydraulics — filtration, backwash, balance tank, dosing systems

Fair
R&M
Moderate
$230k$258kView

Year-by-Year Spend

R&M vs Capital expenditure for GH Aquatic & Gym

SAMP updated — June 2025 review

Building added to platform