K2 Building

Preparatory School

BLDG-K2-PREP • Last updated June 2025

10-Year CapEx

$1.5M

R&M:$837k (56%)
Capital:$653k (44%)
Timeline
Near-term (Yr 1–2):$310k
Medium-term (Yr 3–5):$369k
Long-term (Yr 6–10):$812k
Risk Profile
Highest risk:
Moderate

0 High/Very High items

Next major expenditure: CY2031

ItemDescriptionConditionTypeRiskNear-Term10-Yr TotalActions
2.2.1

Pitched and hipped terracotta tile roof, gutters, fascia and associated roof drainage

Good
R&M
Low
$10k$460kView
4.1

7x ducted reverse cycle split systems — various zones (external plant, 2017)

Fair
CAP
Moderate
$224k$224kView
8.1

Passenger lift — MRL type, 900kg capacity, 12 persons (2003)

Fair
CAP
Low
$0$286kView
5.3

Solar PV system — 135 roof panels at 250W each, 33.7kWp total (installed 2014)

Good
CAP
Low
$0$8kView

Year-by-Year Spend

R&M vs Capital expenditure for K2 Building

SAMP updated — June 2025 review

Building added to platform

Linked to Risk Register